Synopsis of the Role –
Conduct Time study, Line Balancing, VSM studies, Lean Layout Designing, manufacturing lead time reduction, etc. for DP products
Job Responsibility :
Conduct time study, line balancing studies & prepare norms
Prepare Layouts based on lean concept
Estimate Manpower requirement for the month’s sales based on Norms
Lead MOST / PDMS study of lines, release report and comparison with time study
VSM studies / Spaghetti charting, Lead time study of existing lines and reduction plan
Suggest improvements to make layouts compact, low cost automation, flow improvement
Prepare Capacity sheet machine-wise, cellwise and product-wise
Prepare Capacity summary for the plant and keep it updated
Minimum Criteria :
Qualification : BE - IE / Mech
Experience : Minimum 5 years
Desired Criteria :
Certification in Lean Manufacturing
MOST Certified Applicator
Knowledge, Skills & Abilities :
Working knowledge in MCB product
Knowledge of Lean tools, 8 losses, SMED, VSM, Layout designing etc.
Knowledge of conducting Time, Method study, Line Balancing by clock or PDMS (MOST)
Strong mathematical & analytical ability
Good Proficiency in Auto Cad, Excel, Power Point
If you are interested share your CV at varsha.tomar@havells.com
Deputy Manager • Gurgaon, Haryana, India