Safely dismantle existing EV battery packs as per standard operating procedures (SOPs).
Remove and refit Flexible Printed Circuits (FPCs) within battery modules.
Cut or modify module side plates (aluminum / plastic) when required.
Apply PET insulation stickers for electrical safety.
Install pressure distribution plates to maintain module strength and alignment.
Reassemble battery packs with precision and safety compliance.
Maintain detailed campaign records , including logbooks, reports, and photographic documentation.
Requirements
Engineering Engineering • Surat, GJ, IN